Purpose
Scheduled to start October 29, 2007, Sinai's newest project features the vertical addition of a 3-story build-out with supporting infrastructure and helipad. Also included is the addition of a new 6-story link that will joint the existing hospitals to the new tower. This link (Sinai's bridge) will enclose a 4-story lobby atrium.
Highlights
• 120,000 s.f. Addition
• 3 new floors, approx. 25,000 s.f. each
• +100 private room bed addition
• 6 story link connecting the existing North Tower with the new South Tower.
• 8,000 s.f. 4-story atrium
• Green roof on the 4th floor with garden
• New mechanical system with redundancy
• 2 brand new elevator banks
• Extension of existing stair tower.
Project Particulars
Sinai 4th Floor
Intensive Care Unit (ICU)
• 29 Beds + CICU Beds
• 26,600 Square Feet
• Construction – June 2008
• Occupancy – July 2009
Sinai 4th Floor
Multi (OR/ Pre-Op/ PACU)
• 19 Bed Pre-Op
• 40 Bed Post Anesthesia Care Unit
• Four new Operating Rooms
• All larger then 650 square feet
• Construction start May 2009
• Phased Occupancy – Feb 2010–Dec 2010
Sinai 5th Floor
Shell Space (Traumatic Brain Injury)
Sterile Processing Expansion
Sinai 6th Floor
Intermediate Care Unit (IMC)
• 36 Beds
• 26,600 Square Feet
• Construction – June 2008
• Occupancy – May 2009
Current Progress